
Case studyBath
Greenhouse Base Construction
Greenhouse base built from the ground up — solid foundations, drainage, and a level platform ready for the greenhouse structure.
- Structural & Scale Builds
- Real Aspect Builds project
- Fixed-price contract
The brief
Greenhouse base built from the ground up — solid foundations, drainage, and a level platform ready for the greenhouse structure.
The challenge
A greenhouse needs a base that won't move. Ground prep, drainage, and a level concrete platform — all done to the right tolerance so the greenhouse sits plumb and square with no stress on the glass.
How we executed it
Site cleared and levelled. Drainage considered and built in. Solid concrete base poured and finished level. Ready for the greenhouse structure to drop straight on.
Photographs from Bath
6 photos from this project — every one taken on site.






Planning something similar?
This was a structural & scale builds project in Bath. The same crew, the same fixed-price process and the same standard apply to your project — see the maintenance visit service page,or book a free site visit and get a written quote within 48 hours.
